Pune Ring Road and Property (2026): Route by Segment, Where Access Improves, and What Landowners Should Check

The Pune Ring Road is MSRDC's outer ring expressway around Pune and Pimpri Chinchwad, about 169 to 170 km long. The western stretch from Urse to Varve was about 30 per cent built in September 2026, with opening targeted for December 2027; the east is targeted for December 2028.

Key takeaways

  • The Pune Ring Road is MSRDC’s outer ring around Pune and Pimpri Chinchwad, about 169 to 170 km in all, linking the expressway and highways around the city.
  • The western stretch from Urse to Varve was about 30 per cent complete in early September 2026, with opening targeted for December 2027.
  • The eastern stretch is targeted for December 2028. The 31.8 km south-east link got administrative approval in September 2026, and its land acquisition is only now starting.
  • For property, what matters is where your land sits: inside the corridor, near an interchange, or beside the road with no exit.
  • Check the 7/12, the zone and the official alignment before you pay a “ring road premium”. The PMRDA draft DP that brokers quote was cancelled.
  • TalkingLands Insights shows the ring road over Satbara parcels on one map, with 5,000 free coins at sign-up.
Ring road impact checker

Where is your land relative to the Pune Ring Road?

Pick the case that fits your land. You get what the ring road means for it and the checks to run before you buy, sell or hold.

Inside the right of wayThe 2021 draft EIA for the western road gives a right of way of 110 metres. Land inside the corridor is acquired for the road, so you get compensation, not a roadside plot.
Never pay for land inside the corridor as if it were frontage.
Within reach of an interchangeThis is where the road changes access. The outer ring road is planned as an access-controlled expressway, so traffic gets on and off only at interchanges.
  • Get the exact interchange location from the official alignment, not a broker’s sketch.
  • Check the zone of the land and the road that links it to the interchange.
Next to the road, but no exit nearbyBeing close to an expressway is not the same as having access to it. You may get noise and a wall, but your trip still runs to the nearest interchange.
  • Measure the drive to the nearest interchange, not the distance to the road.
  • Check for service roads and underpasses in the final design.
Soratapwadi to Varve Budruk stretchThis 31.8 km stretch moved from NHAI to MSRDC and got administrative approval in September 2026. Land acquisition starts now, so this is where gat numbers are still being finalised.
  • Watch for acquisition notices for your village.
  • Do not buy here until you know whether the land is in the corridor.
PMRDA’s Inner Ring RoadThis is a separate, closer road run by PMRDA, tied to its town planning schemes. Read our Inner Ring Road status guide.
Find your land on the map firstSearch the village on TalkingLands Insights, turn on Connectivity → Ring Road, and match your gat number on the Satbara parcel layer. Then come back to the case that fits.

Land listings around Pune now lead with one line: “on the ring road”. Sometimes that is true and useful. Sometimes the land is inside the road corridor and will be acquired, or it sits beside the road kilometres from the nearest exit. This guide looks at the ring road from the landowner’s side: where each segment runs, how far along it is, which areas gain access, and what to check. For the full village list, see our Pune Ring Road villages and status page.

What the Pune Ring Road is

The Pune Ring Road, often called the outer ring road, is being built by the Maharashtra State Road Development Corporation (MSRDC) to take through traffic around Pune and Pimpri Chinchwad. A September 2026 report put the total planned length at 168.981 km, and another describes it as a 170 km road linking nine national highways.

  • It is an expressway. MSRDC’s 2021 draft environmental study for the western stretch describes a 3+3 lane access-controlled road with a 110 metre right of way.
  • It is not the Inner Ring Road. PMRDA runs a separate, closer ring road. Our Inner Ring Road guide covers it.
  • Construction began in May 2025 on the western stretch, according to MSRDC’s announcement at the time.

Route and status by segment

MSRDC has split the road differently over the years, so lengths vary by source. This is how the latest reports describe it.

SegmentFrom and toReported lengthTalukasStatus (Nov 2026)
WestUrse (Mumbai–Pune Expressway) to Varve / Kelwade (Satara road)64.8 to 69 kmMaval, Mulshi, Haveli, BhorUnder construction, about 30 per cent complete (Sept 2026); opening targeted Dec 2027
EastUrse to Soratapwadi (Solapur road side)72.3 kmMaval, Khed, HaveliLand acquisition reported at about 98 per cent (Nov 2025); completion targeted Dec 2028
South-east linkSoratapwadi (Valti) to Varve Budruk (Shivare)31.8 kmHaveli, Purandar, BhorAdministrative approval Sept 2026; land acquisition starting

The western stretch runs from Urse past villages such as Pachane, Chandkhed, Pimploli, Ghotawade, Kasar Amboli, Urawade, Mutha, Sangrun, Khamgaon Maval and Kalyan to Varve, through 38 villages in four talukas according to the 2021 draft study. Its biggest works are a 5.8 km tunnel behind Sinhagad Fort, about 80 per cent excavated in September 2026, and a 640 metre bridge at Khadakwasla, expected by August 2027.

The eastern side, per the same study, crosses the old Mumbai–Pune highway near Talegaon, the Nashik road at Kuruli, the Ahmednagar road at Lonikand and the Solapur road near Theur. The south-east link joins the Solapur and Satara highways. It was first planned under NHAI; the state moved it to MSRDC, which must acquire 70 per cent of the land before awarding the contract and hold 90 per cent before the work order. Its approved cost is ₹10,502.36 crore.

Where the reports differ: the western length is 64.8 km in one September 2026 report, 68.8 km in MSRDC’s 2021 draft study and 69 km in another report. Targets have moved too: an earlier report quoted the Public Works Minister with May 2026 for the west and May 2028 for the east, while MSRDC’s September 2026 update says December 2027 and December 2028. One report gave 18 per cent overall progress in November 2025, but it is not clear which stretches that covered.
Simplified schematic of the Pune outer ring road showing the western package from Urse to Khed Shivapur and the eastern package around the city, with proposed interchanges

Simplified schematic, not to scale. Positions are approximate; check the official alignment for your gat number.

How the road changes access for property

A ring road does not lift every village it passes. It changes travel time for land that can reach an interchange, and it takes land that lies in its path.

  • Interchanges matter most. On an access-controlled road you can only join at interchanges. The 2021 draft study listed six for the western stretch. Land with a short drive to one gains the most new access.
  • Through traffic moves out of the city. Trucks heading between the highways can skip central Pune. MSRDC expects the west road to give Hinjewadi a new route towards Mumbai, about 4 km from Phase 3.
  • Roadside is not access. Land beside the road but far from an exit gets the noise without the shortcut.
  • Zoning decides use. Better access does not change what the land can be used for. The PMRDA draft DP that once showed new zones has been cancelled; see our PMRDA DP 2041 status guide.

Areas along the route

These are the belts the road passes through, from the published route. We do not predict prices; this is about access.

  • Maval, near Urse and Talegaon: where the road meets the Mumbai–Pune Expressway.
  • Mulshi, around Ghotawade and the Paud road: the west road passes near the Hinjewadi side and Pirangut.
  • Haveli and Bhor, around Khadakwasla, Sinhagad and Kalyan: the tunnel and bridge section, ending at Varve on the Satara road near Khed Shivapur.
  • Khed, around Kuruli on the Nashik road: close to the Chakan industrial belt; see our Chakan–Talegaon corridor guide.
  • Haveli east, around Lonikand and Theur: where the road crosses the Ahmednagar and Solapur roads.
  • Purandar and Bhor, on the south-east link: between the Solapur and Satara highways, where acquisition is just starting.

What landowners should check

  1. Is the gat number in the corridor? Check the published village and survey lists and the 7/12 for an acquisition entry. Our 7/12 extract guide shows how to read it.
  2. How far is the nearest interchange by road? Use the official alignment, not a brochure map.
  3. What is the zone? Ask PMRDA or the local planning authority in writing which plan applies now.
  4. Is there legal access? A road to the land, and whether service roads or underpasses are planned.
  5. Is the title clean? Have a lawyer check the title, mutation entries and any pending acquisition.

How to check on TalkingLands Insights

  1. Sign up free on TalkingLands Insights. New accounts get 5,000 coins.
  2. Search the village and turn on Connectivity → Ring Road to see the alignment.
  3. Turn on the Satbara parcel layer and zoom in to find your gat number beside the road.
  4. Add Boundary → Master Plan for zoning colours, and Risk layers such as Notified Lands and Water body. Zoom in if a layer is greyed out.
  5. Click Get Report, then verify the result with MSRDC, the land acquisition office and a lawyer.

What it shows: the ring road alignment on satellite imagery, parcel outlines from the Satbara layer for covered Pune villages, zoning colours and risk layers around the land.
What it does not show: full ownership for Pune, final interchange designs, or whether your gat number has been acquired. It does not certify title or approvals.

TalkingLands Insights satellite map of Pune with the outer and inner ring road alignments highlighted in yellow around the city

Ring road alignments around Pune on TalkingLands Insights (Connectivity → Ring Road).

Common mistakes

Buying inside the corridorLand in the right of way is acquired. Check the gat number first.
Trusting distance to the roadWhat counts is the drive to the nearest interchange.
Quoting the cancelled PMRDA draftA zone in the 2021 draft has no legal force now.
Mixing up the two ring roadsMSRDC’s outer road and PMRDA’s inner road are separate projects.
Treating target dates as fixedOpening dates have already moved. Plan around status, not promises.

See the ring road over your gat number

Sign up free and get 5,000 coins. Turn on the Ring Road and Satbara parcel layers and see exactly where your land sits.

Sign up free

Frequently asked questions

What is the Pune Ring Road?▾

It is an outer ring expressway around Pune and Pimpri Chinchwad being built by MSRDC, about 169 to 170 km long in all, to take through traffic around the city and link the expressway and highways.

When will the Pune Ring Road open?▾

MSRDC's September 2026 update targets December 2027 for the western stretch and December 2028 for the eastern stretch. Earlier targets were different, so treat these dates as targets.

How much of the Pune Ring Road is complete?▾

The western stretch was about 30 per cent complete in early September 2026, according to MSRDC, with 65 per cent targeted by December 2026.

Which talukas does the Pune Ring Road pass through?▾

The western stretch runs through Maval, Mulshi, Haveli and Bhor. The eastern side runs through Maval, Khed and Haveli, and the south-east link through Haveli, Purandar and Bhor.

Is land next to the Pune Ring Road worth more?▾

We do not predict prices. Access improves mainly for land that can reach an interchange. Land inside the right of way is acquired, and land beside the road far from an exit may not gain access at all.

How do I know if my land is in the ring road corridor?▾

Check the published village and survey lists, the 7/12 for an acquisition entry, and the official alignment. Our Pune Ring Road village page lists the villages. On TalkingLands Insights you can see the alignment over Satbara parcels.

Is the Inner Ring Road the same as the Pune Ring Road?▾

No. The Inner Ring Road is a separate PMRDA project closer to the city, tied to its town planning schemes. The outer ring road is built by MSRDC.

Updated 5 November 2026. This guide summarises MSRDC documents and news reports on the Pune Ring Road. Lengths, targets and acquisition figures differ between sources and can change. We do not predict prices. This is general information, not legal advice or investment advice; confirm with MSRDC, the land acquisition office and a property lawyer.